Over $150K The HOLYOKE HOUSING AUTHORITY, the Awarding Authority, invites sealed bids from Contractors for the Underslab Pipe Replacement - Rosary Towers at Rosary Towers in Holyoke, Massachusetts, in accordance with the documents prepared by MACRITCHIE ENGINEERING, INC..
The Project consists of but not limited to:
Replacement of underslab sanitary and storm piping and restoration of areas affected.
The work is estimated to cost $1,560,000.00.
All bidding Requests for Information (RFIs) shall be submitted online by 05/11/2026 at 3:00PM EDT for filed sub-bids and by 05/18/2026 at 3:00PM EDT for general bids. Bids are subject to M.G.L. c.149 §44A-J & to minimum wage rates as required by M.G.L. c.149 §§26 to 27H inclusive.
THIS PROJECT IS BEING ELECTRONICALLY BID AND HARD COPY BIDS WILL NOT BE ACCEPTED.
Please review the instructions in the bid documents on how to register as an electronic bidder. All Bids shall be submitted online at www.biddocs.com and received no later than the date and time specified.
General bidders must be certified by the Division of Capital Asset Management and Maintenance (DCAMM) in the following category of work, General Building
Construction, and must submit a current DCAMM Certificate of Eligibility and signed DCAMM Prime/General Contractor Update Statement.
General Bids will be received until 21 May 2026 at 3:00PM EDT and publicly opened online, forthwith.
Filed Sub-bids for the trades listed below will be received until 14 May 2026 at 3:00PM EDT and publicly opened online, forthwith.
Filed sub-bidders must be DCAMM certified for the trades listed below and bidders must include a current DCAMM Sub-Bidder Certificate of Eligibility and a signed DCAMM Sub-Bidder’s Update Statement.
Trades
Resilient Flooring
Plumbing
General bids and sub-bids shall be accompanied by a bid deposit that is not less than five (5%) of the greatest possible bid amount (including all alternates), and made payable to:
Advertisement to Bid
00 11 13 - 1
v1.1-20260202 MGL c.149 Over $150K
Contact
Address:
21 Bowers Street
Holyoke, MA 01040
Instructions:
Meet at 21 Bowers Street, Holyoke, MA
The hard copy Contract Documents may be seen at:
Nashoba Blue Inc.
433 Main Street
Hudson, MA 01749
978-568-1167
Share This Project
Section
00 11 13
Advertisement to Bid
MGL c.149
Estimated cost
All Bids shall be submitted online at www.biddocs.com
General Bids will be received until 21 May 2026 at 3:00PM
Filed Sub-bids for the trades listed below will be received until 14 May 2026 at 3:00PM EDT
The Davis Bacon Act
The Davis Bacon Acts and Related Acts apply to contractors and subcontractors performing on federally funded or assisted contracts in excess of $2,000.00 for the construction, alteration or repair (including painting and decorating) of public building or public works. A copy of the wage decision is included in each bid package. The goal of the Davis Bacon Act is to protect the statutory rights of construction workers by enduring they are being paid appropriately for HUD or HUD “related acts” construction project. Failure to comply with Davis Bacon regulations could lead to a breach of contract and debarment from further participation in HUD programs.
Section 3 Requirements
Section 3 of the HUD Act of 1968 is a means by which HUD fosters local economic development, neighborhood economic improvement and individual self-sufficiency. Under ECC’s Section 3 program, there are multiple requirements for every contract. Section 3 requirements are outlined in HUD’s 24 CFR 75.
MBE/ WBE Requirements
It is the policy of the ECC that Minority, and Women Business Enterprises (MBE/WBE) as defined in regulations developed by the Secretary of the Department of Housing and Urban Development (HUD) and promulgated in 24 CFR Part 85, HUD Handbook 7460.8 and 7485.1 REV-2 Section 6(a) and Notice PIH 88-11 (PHA) shall have the maximum opportunity to participate in the performance of contracts financed in whole or in part with federal funds and that bidders, proposers or contractors and their subcontractors or suppliers shall take all necessary and reasonable steps to ensure that MBE/WBEs shall have the maximum opportunity to compete for and perform contracts financed in whole or in part by federal funds.